Maine offshore wind terminal
Alternatives Analysis
Draft Pre-Application Alternative Analysis (PDF)
Attachment A - Alternative Analysis Matrix (PDF)
Attachment B - Mack Point Dredge Investigation (PDF)
Attachment C - Mason Station (PDF)
Attachment D -Sprague Alternatives (PDF)
Attachment E - Natural Resources Assessments (PDF)
Attachment F - Mack Point Dredge Material Management Plan (PDF)
Attachment G - Ship Simulation Study (PDF)
Attachment H - Cost Estimates (PDF)
Attachment I - OSWPAG Summary (PDF)
https://www.maine.gov/mdot/projects/searsport/windport/docs/OSWPAG%20Summary.pdf
Conservation of Maine's Biggest Bay, 2004 - Present. Use search bar or archives list on right
Search
Oct 12, 2024
Maine DOT's "alternatives analysis" of a Searsport wind port October 2024
Aug 20, 2023
Maine Public: August 12, 2023 . Work underway on Sears Island
by Nicole Ogrysko, Maine Public August 12, 2022
Work is underway to test the first of two sites as a potential hub for wind energy development off Maine’s coast.
Gov. Janet Mills directed the Maine Department of Transportation to explore the midcoast town of Searsport. A study done last year pointed to a portion of state-owned land on Sears Island and also nearby Mack Point as potential site options.
Crews have begun cutting trees and clearing a path on the island for geotechnical drilling and testing, said Matt Burns, executive director of the Maine Port Authority.
Testing will eventually happen at the Mack Point terminal as well, he said.
“We want to collect this data and really be able to look at the sites side by side, compare the pros and cons and distill that data that’s actually digestible by a group that could look at it objectively,” Burns said.
Rolf Olsen, vice president of Friends of Sears Island, said he supports Searsport as a potential hub for wind energy development but believes the island should be preserved for recreational purposes.
Mack Point terminal is already an industrial site and has served as a delivery point for land-based wind turbines.
“There’s 50 years of history trying to develop Sears Island, and this is the latest iteration,” Olsen said. “I’m in favor of wind energy, alternative energy, but do it on Mack Point, not Sears Island.”
Burns said the Sears Island testing should be finished by the end of this month. There’s no timeline for when the state might choose between these two sites or consider other alternatives, he added.
Maine wants to establish the nation’s first offshore floating wind research array in the Gulf of Maine, which it views as a key step in achieving its renewable goals of 80 percent by 2030.
This article appears through a media partnership with Maine Public.
Dec 1, 2021
Sears Island - Latest port wannabees make their move
Sears Island Wind Port proposal? Read all 17 sections and 2 appendices, as seperate pdf files
In this document, a 94 page November 2021 report put out by consultants Moffatt & Nichol for the Governor's Energy Office, tries to make the case for ignoring a perfectly ample alternatives to Sears Island to develop the state "Windport": Bath Iron Works.
Offshore Wind Port Infrastructure Feasibility Study full 94 page study Concept Design Report Moffat & Nichol . Nov 2021
Part 4 Floating Offshire Wind Criteria
Part 6 Initial Analysis/ Elimination of 2 sites
Part 7 Site Characteristics of remaining two sites
Part 8 Site Layouts and Required Infrastructure
Part 9 VHB Environmental Assessment on Recommended Infrastructure
Part 10 Cost Estimating and Construction Schedules
Part 11 Assessment of Proposed Site
Part 12. Port of Searsport Offshore Windhub
Part 13 Sears Island Conservation Area Proposed Improvements
Part 14. Offshore Wind Comercial Analysis
Part 15 Recommended Next Steps
Part 16 Project Geotechnmical Risks
Part 17. Limitations of this Report
Appendix A. Conceptual Drawings 9 pages
Appendix B. Cost Estimates and Schedules
App B1 Construction Schedules/ Proposed Phases Charts
END