The Maine Dredge Team met today October 1, 2026 at the Rachel Carson National Wildlife Refuge in Kennebunk. Listen and read about it
Searsport Audio Presentation and discussion of the waters around Searsport _6min47sec
Conservation of Maine's Biggest Bay, 2004 - Present. Use search bar or archives list on right
The Maine Dredge Team met today October 1, 2026 at the Rachel Carson National Wildlife Refuge in Kennebunk. Listen and read about it
Searsport Audio Presentation and discussion of the waters around Searsport _6min47sec
Searsport Harbor Maintenance Dredging (Searsport, ME)
o Description: Mechanical maintenance dredging of approximately 40,000 cy of mixed sand and silt that is not suitable for open water disposal due to elevated mercury levels. The channel is 3,500 ft long and 500 ft wide with a 1,500-ft-wide turning basin in front of the piers at Mack Point. It is authorized to a depth of -35 ft MLLW with 2 ft of overdepth.
o Disposal: Proposal includes the construction of two confined aquatic disposal (CAD) cells – one starter cell and one primary cell – just west of the FNP. The top 3 ft of sediment in the starter cell location (~ 5,200 cy) would be held in scows during construction. Sediment below the surficial layer (~17,000 cy), which is suitable for open water disposal, would be taken to the Rockland Disposal Site (RDS), approximately 25 nm south of Searsport Harbor. Then the top 3 ft of sediment from the starter cell and primary cell location (~10,200 cy) would be placed into the starter cell. Next, the remaining suitable material in the primary cell footprint (~44,500 cy) would be taken to RDS. Finally, the unsuitable materials from the FNP would be placed in the primary CAD cell.
Approximately 3 ft will be left at the top of the cell for natural cap.
o History: First constructed in 1962; no maintenance dredging has been conducted
o Status: Environmental review underway; USACE to hold public information meeting; targeting 2027-28 dredging window
o Meeting question: What is the water depth at the CAD cell location? Answer: Most recent survey shows a range between 25 – 31 ft deep at MLLW.
o Meeting comment: Full design is not yet completed – whether a starter cell is needed is not finalized; multiple scows or a large scow would be needed if a starter cell isn’t used; keeping this option flexible allows more contractors to bid and can make the project less expensive.
o Meeting question: How are the sediments in the channel and CAD cell different in terms of suitability? Answer: the top 3 ft of the CAD cell is also not suitable – it would be held at the site while the deeper, suitable sediment is taken to RDS.
o Meeting question: How could the presence of CAD cells affect potential wind port development in the area? Answer: Designs have been shared with Sprague and they do not have any issues.
o Meeting comment: The need for maintenance dredging after over 10 years of planning is a higher priority so ships don’t have to wait on tides.
o Meeting comment: Pat will provide information on composition of clean material
After the meeting, all the documentation for the Searsport project was posted here: https://www.nae.usace.army.mil/Missions/Civil-Works/Navigation/Maine/SearsportHarbor/ Information on the composition of the material can be found in the Draft Preliminary Assessment, Suitability Determinations, CAD Cell Investigation Report, and Engineering Designs
o Meeting question: Were beneficial uses of the material considered vs. disposal at RDS?
Answer: Yes, capping contaminated areas in Penobscot Bay was considered but there is uncertainty on whether this would be successful and several years of testing and studies would be required, which would delay the maintenance dredging too long considering vessel draft requirements
END
On August 26, 2024 The Maine Dredge Team meet to discuss active and upcoming projects and proposals requiring dredging
Intro of Dredge Team members & public attendees 14minutes
Searsport "Windport" Discussion 9 minutes
More to come
Pete Tischbein, Army Corp
Craig Martin, navigation section, ACOE
Wendy ____ Army Corp of Engineers planning
John Chelley Chief of planning, f Army Corps
Mark Habel Corps new eng, navigation
Ed O'Donnel chief navigation section and the ONF program
Dennis Nault Maine DMR
Rob Elder MDOT trade office
Maine DEP ____ Green
Paul Mercer, commissioner DEP
Mark Bergeron on MDEP
Maine Geological Survey
Maine Port Authority - Dredge committee
Patty Aho, Sen Collins office
staffer, Sen Collins for York County
Pingree staffer Portland
Senator Angus King staffer
Tom Dobbins Portland harbor commission
Jim Katz Saco coastal waters chief
Patrick Fox Saco
Payne, Normandeau Associates
Biddeford harbor commission
Wells harbormaster & town manager